IAQ Team Building Maintenance Plan (BMP) Visit Progress - Waters Landing ES (109) Initial Visit

Kick-Off Meeting: 05/30/07

Walkthrough: 06/12/07

Work Plan Provided to School: 07/23/07 - Download

Supply Ventilation Unit PM (Cleaning; Mechanical Evaluation; Repairs, if needed):

Unit ID
Area/Zone served by Unit
Unit Type*
Cleaned
Mech Eval
Repairs
109-RTU4-MainOffice Main office suite
RTU
 
109-HU/StaffWkRm-A-1 Hall by main office workroom
Fan Coil Unit
09/26Q
 
109-Health-D-1 Health room
Heat Pump
 
109-AsstPrin-D-1 Assistant Principal's office
Heat Pump
 
109-Prin-A-1 Principal's office
Heat Pump
 
109-Prin-D-1 Principal's office
Heat Pump
 
109-Con-A-1 Main office conference room
Heat Pump
 
109-CopyRm-A-1 Main office copy room
Heat Pump
 
109-Con2-A-1 Main office large conference room
Heat Pump
 
109-HU/MainEnt-B-1 Main entrance vestibule
Fan Coil Unit
09/28S
 
109-K1-D-1 K1
Unit Ventilator
10/02T
 
109-HU/K1-B-1 K1, K2 vestibule
Fan Coil Unit
09/28Q
 
109-K2-D-1 K2
Unit Ventilator
10/03K
 
109-K3-D-1 K3
Unit Ventilator
10/02Q
 
109-HU/K3-C-1 K3 vestibule
Fan Coil Unit
09/28K
 
109-HU/K3-E-1 Hall by K3
Ceiling Fan Coil Unit
09/28Q
 
109-K4-D-1 K4
Unit Ventilator
10/02K
 
109-HU/K4-C-1 K4 vestibule
Fan Coil Unit
09/28K
 
109-HU/Stair1-B-1 Stairwell by main entrance
Fan Coil Unit
09/28S
 
109-Music-A-1 Music room
Unit Ventilator
10/03T
 
109-HU/Music-CEF1 Student restrooms across main office
CEF
 
109-DPRm-A-1 Dual Purpose room
Unit Ventilator
10/03Q
 
109-Art-A-1 Art room
Unit Ventilator
10/03S
 
109-1-A-1 Room 1
Unit Ventilator
10/03J
 
109-HU/1-B-1 Hall front entrance by room 1
Fan Coil Unit
09/26Q
 
109-2-A-1 Room 2
Unit Ventilator
10/03L
 
109-HU/2-CEF2 Student restrooms across IMC
CEF
 
109-3-A-1 Room 3
Unit Ventilator
10/04T
 
109-4-A-1 Room 4
Unit Ventilator
10/04Q
 
109-5-A-1 Room 5
Unit Ventilator
10/05T
 
109-HU/5-E-1 Hall entrance by room 5
Ceiling Fan Coil Unit
09/26S
 
109-HU/Stair3-A-1 Hall stairwell by room 5
Fan Coil Unit
09/26SK
 
109-MechRm2-AHU Gym (heating and ventilation only)
AHU
 
109-HU/Gym-A-1 Gym outside entrance
Fan Coil Unit
09/26K
 
109-ElevatorRm-C-1 Elevator mechanical room
Fan Coil Unit
 
109-Band-E-1 Band room
SSAC
 
109-StaffLounge-C-1 Staff lounge (first floor)
Unit Ventilator
 
109-6-C-1 Room 6
Heat Pump
10/05Q
 
109-7-C-1 Room 7
Heat Pump
10/10LJ
 
109-8-C-1 Room 8
Heat Pump
10/12K
 
109-9-C-1 Room 9
Heat Pump
10/10LJ
 
109-10-C-1 Room 10
Heat Pump
10/11LJ
 
109-HU/10-E-1 Hall by room 10
Ceiling Fan Coil Unit
 
109-HU/Stair4-C-1 Stairwell by room 10
Fan Coil Unit
 
109-RTU5-MPR Multipurpose Room
RTU
 
109-MPR-C-1 Multipurpose Room
Baseboard Heater
 
109-Stage-C-1 MPR stage
Fan Coil Unit
 
109-BoilerRm-E-1 Boiler room
Ceiling Heater
 
109-RTU2-Kitchen Kitchen, staff dining
RTU
 
109-SPT-D-1 Speech room
Heat Pump
10/11LJ
 
109-2A-D-1 Room 2A
Heat Pump
 
109-2B-D-1 Room 2B
Heat Pump
 
109-11-A-1 Room 11
Unit Ventilator
 
109-12-C-1 Room 12
Fan Coil Unit
 
109-GBR/12-C-1 Girls' restroom by room 12
Fin-Tube Heater
 
109-BBR/12-C-1 Boys' restroom by room 12
Fin-Tube Heater
 
109-SBR/12-A-1 Staff restroom by room 12
Fin-Tube Heater
 
109-HU/12-CEF5 Restrooms by room 12
CEF
 
109-Storage206-A-1 Storage room 206 by room 12
Fin-Tube Heater
 
109-12-CEF4 Restrooms by room 12
CEF
 
109-13-A-1 Room 13
Unit Ventilator
 
109-14-C-1 Room 14
Fan Coil Unit
 
109-15-A-1 Room 15
Unit Ventilator
 
109-16-C-1 Room 16
Fan Coil Unit
 
109-17-A-1 Room 17
Unit Ventilator
 
109-18-A-1 Room 18
Unit Ventilator
 
109-19-A-1 Room 19
Unit Ventilator
 
109-20-A-1 Room 20
Unit Ventilator
 
109-21-A-1 Room 21
Unit Ventilator
 
109-HU/21-B-1 Hall by room 21
Fin-Tube Heater
 
109-Storage225-D-1 Storage room 225 across room 21
Fin-Tube Heater
 
109-22-C-1 Room 22
Heat Pump
 
109-23-C-1 Room 23
Heat Pump
 
109-24-C-1 Room 24
Heat Pump
10/12J
 
109-25-C-1 Room 25
Heat Pump
10/12T
 
109-26-C-1 Room 26
Heat Pump
10/12Q
 
109-HU/26-B-1 Hall by room 26
Fin-Tube Heater
 
109-Storage249-C-1 Storage room 249 across room 26
Fin-Tube Heater
 
109-RTU1 Second floor rooms
RTU
 
109-RTU3-IMC IMC
RTU
 
* AHU: central air handling unit; Ceiling Unit Ventilator: ceiling-mounted ventilation unit; Unit Ventilator: wall-mounted ventilation unit; Ceiling Fan Coil Unit: ceiling-mounted ventilation unit (does not supply outdoor air); Fan Coil Unit: wall-mounted ventilation unit (does not supply outdoor air); RTU: rooftop air handler; VAV box: variable-air volume box (duct-mounted device that controls room temperatures by modulating airflow); Reheat Coil: duct-mounted device that provides supplemental heat. VAV boxes and reheat coils typically do not require cleaning; Heat Pump: Heat pump or refrigerant air-conditioner with electric heat; SSAC: split-system air-conditioner; Fin-Tube Heater: hydronic radiant heater (no fans); CEF: cabinet exhaust fan (provides make-up air for exhaust fans).

 

Exhaust Fan PM (Mechanical Evaluation; Repairs, if needed):

Fan No.
Area/Zone served by Unit
Unit Type
Mech Eval
Repairs
   
 
   
 
   
 
   
 
   
 
   
 
   
 
   
 
   
 
   
 
   
 
   
 
   
 
   
 
 
 

 

Air Station PM:

 

Follow-Up Walkthrough:

 

Exit Meeting (Presentation of Site Visit Report and Building Maintenance Plan):

 

 

Notes:
Recommended replacement of water-damaged, mold-contaminated pipe insulation in ceilings of rooms 2, 3, 4, and 5;
replacement of carpet in the music room; and installation of an exhaust fan for the main office copy room to Environmental Safety
Coordinator Yarup.
Visit suspended pending completion of HVAC energy management contractor project (08/09). Work resumed (09/26).
 

 

 

Updated May 15, 2011 | Maintained by Division of Maintenance ITSS

HOME | PARENTS | STUDENTS | STAFF | ABOUT | SCHOOLS | COMMUNITY | BOARD OF ED | TOP up arrow
©1995–2007 Montgomery County Public Schools, 850 Hungerford Drive, Rockville, Maryland 20850
Contact | Privacy | Nondiscrimination/ADA | Get Acrobat | Get RealPlayer | Montgomery County