IAQ Team Building Maintenance Plan (BMP) Visit Progress - Candlewood ES (508) Initial Visit

Kick-Off Meeting: 01/25/07

Walkthrough: 01/29/07

Work Plan Provided to School: 02/07/07 - Download (Asbestos Information)

Supply Ventilation Unit PM (Cleaning; Mechanical Evaluation; Repairs, if needed):

Unit ID
Area/Zone served by Unit
Unit Type*
Cleaned
Mech Eval
Repairs
508-MainOffice-RTU Main office suite, staff lounge
RTU
03/27LJ
04/16EJC
Re-calibrated thermostat.
508-HU/MainOffice-D-1 Hall by main office
Fan Coil Unit
02/27Q
04/16EJC
Repaired burnt wires.
508-GBR/MainOffice-C-1 Girls' restroom by main office
Fan Coil Unit
03/07Q
04/26EJC
 
508-Lounge-E-1 Staff lounge
Reheat Coil
 
508-IMCStorage-AHU IMC, 18, 19, 20, ESOL
AHU
03/28L
09/26EJC
Re-calibrated thermostat.
508-APR-C-1 All-Purpose Room
Unit Ventilator
03/02J
04/25EJC
Re-calibrated thermostat; re-wired unit.
508-APR-C-2 All-Purpose Room
Unit Ventilator
03/02L
04/25EJC
Re-calibrated thermostat; replaced freezestat.
508-APR-C-3 All-Purpose Room
Unit Ventilator
03/05Q
04/25EJC
Re-calibrated thermostat; re-wired unit; installed new pneumatic restrictor.
508-APR-C-4 All-Purpose Room
Unit Ventilator
03/05T
04/25EJC
Re-calibrated thermostat; re-wired unit; repaired condensate drain line.
508-Kitchen-E-1 Kitchen
Ceiling Unit Ventilator
02/23J
05/01EJC
Re-calibrated thermostat; replaced fan motor.
508-Gym-AHU Gym
AHU
03/06QT
04/16EJC
Re-calibrated thermostat.
508-PEOffice-D-1 Gym Office
Unit Ventilator
02/26Q
04/25EJC
Re-calibrated thermostat.
508-HU/BoilerRm-A-1 Hall by boiler room
Fan Coil Unit
02/28T
03/30EJC
Repaired motor wires.
508-1-A-1 Room 1
Unit Ventilator
03/02S
09/26EJC
Replaced thermostat; adjusted dampers; rebuilt pneumatics.
508-2-A-1 Room 2
Unit Ventilator
03/02Q
03/29EJC
Re-calibrated thermostat.
508-3-A-1
Room 3
Unit Ventilator
02/27J
03/29EJC
Re-calibrated thermostat.
508-4-A-1
Room 4
Unit Ventilator
03/01S
03/29EJC
Re-calibrated thermostat.
508-5-A-1
Room 5
Unit Ventilator
03/01Q
03/29EJC
Re-calibrated thermostat.
508-6-A-1
Room 6
Unit Ventilator
03/01J
03/30EJC
Re-calibrated thermostat.
508-7-D-1
Room 7
Unit Ventilator
03/01T
04/11EJC
Re-calibrated thermostat.
508-8-D-1
Room 8 (left)
Unit Ventilator
02/26J
04/11EJC
Replaced thermostat.
508-8-D-2
Room 8 (right)
Unit Ventilator
02/26L
04/11EJC
Replaced water valve top; replaced thermostat.
508-Music-D-1 Music
Unit Ventilator
03/02T
04/17EJC
Re-calibrated thermostat; re-wired; installed new freezestat.
508-Storage/Music-D-1 Storage room by Music
Fan Coil Unit
03/07QT
04/17EJC
Re-calibrated thermostat.
508-HU/Music-A-1 Hall by Music
Fan Coil Unit
02/27T
04/16EJC
 
508-HU/Music-D-1 Hall by Music
Fan Coil Unit
02/26Q
04/16EJC
Installed and calibrated new thermostat.
508-9-A-1 Room 9
Unit Ventilator
02/22L
04/18EJC
Re-calibrated thermostat; adjusted air dampers.
508-HU/9-E-1 Hall by room 9
Ceiling Fan Coil Unit
02/23Q
04/26EJC
Re-calibrated thermostat; re-wired unit.
508-HU/9-E-2 Hall by room 9
Ceiling Fan Coil Unit
02/23S
04/26EJC
Re-calibrated thermostat; re-wired unit.
508-HU/9-E-3 Hall by room 9
Ceiling Fan Coil Unit
02/23SQJ
04/26EJC
Re-calibrated thermostat; re-wired unit.
508-10-A-1 Room 10 Computer
Unit Ventilator
02/21J
04/18EJC
Re-calibrated thermostat; adjusted air dampers; re-wired, installed new electric-pressure switch.
508-11-A-1 Room 11
Unit Ventilator
02/26L
04/23EJ
Re-calibrated thermostat; replaced pneumatic restrictor.
508-12-C-1 Room 12
Unit Ventilator
02/22S
04/23EJ
Re-calibrated thermostat.
508-13-C-1 Room 13
Unit Ventilator
02/20J
04/23EJ
Re-calibrated thermostat; adjusted fan motor bearing collar; replaced pneumatic restrictor; repaired condenste drain.
508-14-C-1 Room 14
Unit Ventilator
02/21S
04/23EJ
Re-calibrated thermostat.
508-BSM-C-1 BSM office
Unit Ventilator
02/22Q
04/24EJC
Re-calibrated thermostat; re-wired motor plug.
508-HU/BSM-C-1 Hall by BSM office
Fan Coil Unit
02/27T
04/26EJC
Replaced thermostat.
508-IMusic-C-1 Instrumental Music
Fin Tube Heater
03/05S
04/24EJC
Converted storage room - contractor hired to design ventilation unit installation.
508-Art-D-1 Art Room
Unit Ventilator
02/21T
04/23EJ
Re-calibrated thermostat; adjusted fan motor bearing collar; replaced pneumatic restrictor.
508-15-D-1 Room 15
Unit Ventilator
02/20SJ
03/29EJC
Replaced fan motor; replaced shaft and bearings.
508-HU/15-D-1 Hall by room 15
Fan Coil Unit
02/28Q
04/24EJC
 
508-16-C-1 Room 16
Unit Ventilator
02/21L
04/12EJC
Re-calibrated thermostat.
508-17-D-1 Room 17
Unit Ventilator
02/20S
04/11EJC
Re-calibrated thermostat.
508-20-Reheat-E-1 Room 20
Reheat Coil
 
508-GBR/20-D-1 Girls' restroom by room 20
Fan Coil Unit
03/07T
04/26EJC
Replaced on/off switch.
508-21-B-1 Room 21
Unit Ventilator
02/21L
04/16EJC
Re-calibrated thermostat.
508-22-B-1 Room 22
Unit Ventilator
02/21Q
04/16EJC
Re-calibrated thermostat; replaced fan speed switch; re-wired unit.
508-23-C-1 Room 23
Unit Ventilator
02/20T
04/13EJC
Re-calibrated thermostat; replaced fan speed switch.
508-24-C-1 Room 24
Unit Ventilator
02/20Q
04/12EJC
Re-calibrated thermostat; replaced fan motor.
   
 
* AHU: central air handling unit; Ceiling Unit Ventilator: ceiling-mounted ventilation unit; Unit Ventilator: wall-mounted ventilation unit; Ceiling Fan Coil Unit: ceiling-mounted ventilation unit (does not supply outdoor air); Fan Coil Unit: wall-mounted ventilation unit (does not supply outdoor air); RTU: rooftop air handler; VAV box: variable-air volume box (duct-mounted device that controls room temperatures by modulating airflow); Reheat Coil: duct-mounted device that provides supplemental heat. VAV boxes and reheat coils typically do not require cleaning.

 

Exhaust Fan PM (Mechanical Evaluation; Repairs, if needed):

Fan No.
Area/Zone served by Unit
Unit Type
Mech Eval
Repairs
EF-1
Rooms 15, 16, 17, 21, 22, 23, 24
Rooftop exhaust fan
05/01EJC
Replaced fan belt, lubricated bearings.
EF-2
Rooms 9, 10, 11, 12, 13, 14
Rooftop exhaust fan
05/01EJC
 
EF-3
Rooms 3, 4, 5, 6, 7, 8
Rooftop exhaust fan
05/01EJC
 
EF-4
Boys' and girls' restrooms by gym
Rooftop exhaust fan
05/01EJC
Replaced fan belt.
EF-5
Kitchen
Rooftop exhaust fan
05/01EJC
Replaced fan belt, lubricated motor.
EF-6
Trash room
Rooftop exhaust fan
05/01EJC
 
 
 
 
 
 
 
 
 
 
 
   
 
   
 
   
 
 
 

 

Air Station PM: 04/28 - installed automatic drain for compressor, changed oil for compressor, serviced air dryer.

 

Follow-Up Walkthrough:

 

Exit Meeting (Presentation of Site Visit Report and Building Maintenance Plan):

 

 

Notes:
Contractor hired to engineer exhaust fan for main office work room (to reduce heat, ozone from copier) and
installation of ventilation unit for Instrumental Music Room.
 
Recommended removal of carpet (replacement with vinyl floor tile) for rooms 1-9, 11-17, 21-24 to Environmental
Safety Coordinator Sean Yarup. Summer 2007 carpet removal, tile installation scheduled for 1, 2, 3, 4, 5, 11, 12, 14.
 

 

 
     
     
     
  Updated May 1, 2011 | Maintained by Division of Maintenance ITSS  
     
  MCPS HOME | PARENTS | STUDENTS | STAFF | ABOUT | SCHOOLS | COMMUNITY | BACK TO TOP  
  ©1995–2007 Montgomery County Public Schools, 850 Hungerford Drive, Rockville, Maryland 20850  
  Contact | Privacy | Nondiscrimination/ADA | Get Acrobat | Get RealPlayer | Montgomery County
HOME | PARENTS | STUDENTS | STAFF | ABOUT | SCHOOLS | COMMUNITY | BOARD OF ED | TOP up arrow
©1995–2011 Montgomery County Public Schools, 850 Hungerford Drive, Rockville, Maryland 20850
Contact | Privacy | Nondiscrimination/ADA | Get Acrobat | Get Flash | Montgomery County